render shared/citations:
Document Work

Phase 1 Environmental Site Assessment for the Runnymede School Campus

Public Deposited
db_workflow_actions_widget:
db_representative_media_2:

Downloadable Content

Download PDF
db_citations:
db_social_media:
db_work_description:

Full environmental site assessment for the Runnymede school campus, prepared by Northwest Envirocon, Inc. for the Ravenswood City School District. Includes an executive summary and recommendations, as well as full report and appendices. This assessment found that the ground soil of the property was contaminated with arsenic from the 1909 Bay Road property via surface and ground water runoff. To further proceed with the Runnymede school campus project, removal of all contaminated ground soil would be required and a monitoring program to be instituted that included wells and periodic sampling.

db_metadata:
Last modified
  • 05/23/2023
Creator
Contributors
Subject
Language
Date created
Resource type
Rights statement

Relations

db_relationships:
In Collection:
In Administrative Set:

Items

db_items: